Certificate records — Review the certificate holder, scope and current verification status. Confirm the documents applicable to your order.
Why Bolivia’s Market Needs Quality PPGI Coil
Colored roofing sheet — known locally as calamina pintada — is standard for housing, markets, and commercial and agro buildings from the high Altiplano (La Paz, El Alto, Oruro) to the lowlands (Santa Cruz, Cochabamba). High-altitude UV and lowland heat and humidity quickly fade and rust low-grade galvanized sheet, so a reliable PPGI coil supplier for Bolivia provides a solid zinc base (Z80–Z180) under a UV-stable polyester topcoat. Because every ton travels a long way by sea and road, consistent quality and tight thickness tolerance matter even more. Our prepainted coil delivers durable color at competitive landed cost, to ASTM and IBNORCA-aligned specs.
PPGI Coil Grades and Specifications
| Grade / Standard | Thickness (mm) | Zinc Coating | Paint System | Typical Use |
|---|---|---|---|---|
| DX51D+Z (EN 10169) | 0.22 – 0.40 | Z60 – Z120 | Polyester (PE) | Economical calamina pintada |
| DX51D+Z (EN 10169) | 0.30 – 0.50 | Z120 – Z180 | PE / SMP | Housing & commercial roofing |
| SGCC (JIS G3312) | 0.25 – 0.45 | Z80 – Z150 | PE | General colored roofing sheet |
| S250GD+Z (EN 10346) | 0.40 – 0.70 | Z180 – Z275 | PE | Warehouses & agro structures |
Common colors: RAL 3000/3005 (red), RAL 6005 (green), RAL 9002 (white), RAL 5005 (blue). MOQ 25 tons per color and thickness.
Shipping to Bolivia
Bolivia is landlocked, so we ship from Qingdao to Arica or Iquique (Chile) or Matarani (Peru), with onward road transport to La Paz, El Alto, Cochabamba and Santa Cruz. Sea transit is roughly 30–42 days plus 3–7 days inland. We quote FOB Tianjin or CIF to the entry port, with seaworthy export packing built for the long sea-and-road journey.
Frequently Asked Questions
Which port should I use for Bolivia?
Most cargo for western Bolivia (La Paz/Oruro) routes via Arica or Iquique (Chile); Santa Cruz and the south can also use Matarani (Peru). We’ll quote CIF to your preferred entry port.
What is the total lead time to La Paz?
Production 15–20 days + sea 30–42 days + road 3–7 days ≈ 50–70 days factory-to-La Paz.
Can you supply economical thin gauges?
Yes — 0.22–0.30 mm with tight tolerance for cost-competitive calamina pintada.
Payment terms?
T/T (30% deposit, 70% against B/L copy) and L/C at sight, in USD.