Certificate records — Review the certificate holder, scope and current verification status. Confirm the documents applicable to your order.
Why Ecuador’s Market Needs Quality PPGI Coil
Colored steel roofing (techo/cubierta) and cladding serve housing, banana and shrimp-farm sheds, agro-industry and commercial buildings across Guayaquil, Quito, Cuenca and Manta. Ecuador’s three regions — humid Pacific coast, high-UV Andean sierra, and rainy Amazon — all punish low-grade galvanized steel. A reliable PPGI coil supplier for Ecuador provides a strong zinc base (Z120–Z275) with PE for the sierra and PVDF for the salty, humid coast where 10–15 year color life matters. Our prepainted coil meets ASTM and INEN requirements.
PPGI Coil Grades and Specifications
| Grade / Standard | Thickness (mm) | Zinc Coating | Paint System | Typical Use |
|---|---|---|---|---|
| DX51D+Z (EN 10169) | 0.25 – 0.45 | Z90 – Z150 | Polyester (PE) | Economical & housing roofing |
| DX52D+Z (EN 10169) | 0.35 – 0.60 | Z180 – Z275 | PVDF (Kynar 500) | Coastal & farm roofing |
| S250GD+Z (EN 10346) | 0.40 – 0.80 | Z180 – Z275 | PE / SMP | Agro & warehouse roofing |
| ASTM A755 / A653 | 0.30 – 0.70 | G90 – G115 | PE / PVDF | Projects on ASTM spec |
Common colors: RAL 9002 (white), RAL 3000 (red), RAL 5005 (blue), RAL 6005 (green), teja tones. ASTM or EN standards. MOQ 25 tons per color and thickness.
Shipping to Ecuador
We ship from Qingdao to Guayaquil (Puerto Marítimo / Posorja), Ecuador’s principal gateway. Pacific transit is roughly 30–40 days. A 20-ft container carries about 22–25 tons of 0.30–0.50 mm coils. We quote FOB Tianjin or CIF Guayaquil, with seaworthy export packing.
Frequently Asked Questions
PE or PVDF for the Ecuadorian coast?
PVDF (Kynar 500) for Guayaquil, Manta and other coastal/farm projects; PE is cost-effective for the sierra and sheltered use.
Lead time to Guayaquil?
Production 15–20 days + transit 30–40 days ≈ 45–60 days factory-to-port.
ASTM or INEN specs?
Yes — ASTM A755/A653 and EN 10169/10346 per your requirement.
Payment terms?
T/T (30% deposit, 70% against B/L copy) and L/C at sight, in USD.