Certificate records — Review the certificate holder, scope and current verification status. Confirm the documents applicable to your order.
Why Oman’s Market Needs Quality PPGI Coil
Colored roofing, cladding and sandwich panels serve housing, warehouses, industrial zones (Sohar, Duqm SEZ), labour accommodation and commercial buildings in Muscat, Sohar, Salalah and Nizwa. Oman’s intense heat, strong UV and salty Arabian Sea / Gulf of Oman air quickly degrade low-grade galvanized sheet. A serious PPGI coil supplier for Oman provides a solid zinc base (Z120–Z275) and a heat- and UV-stable topcoat — PVDF for premium and coastal projects, PE for general and panel use, to EN/ASTM and OSQ-aligned specs.
PPGI Coil Grades and Specifications
| Grade / Standard | Thickness (mm) | Zinc Coating | Paint System | Typical Use |
|---|---|---|---|---|
| DX51D+Z (EN 10169) | 0.30 – 0.50 | Z80 – Z120 | Polyester (PE) | Sandwich panel skins |
| DX51D+Z (EN 10169) | 0.35 – 0.60 | Z120 – Z180 | PE / SMP | Roofing & cladding |
| DX52D+Z (EN 10169) | 0.40 – 0.70 | Z180 – Z275 | PVDF (Kynar 500) | Premium & coastal roofing |
| S280GD+Z (EN 10346) | 0.40 – 1.00 | Z225 – Z275 | PE / PVDF | Structural roofing |
Common colors: RAL 9002/9010 (white), RAL 7035 (panel grey), RAL 5010 (blue), RAL 3000 (red). Width 1000/1219/1250 mm. MOQ 25 tons per color and thickness.
Shipping to Oman
We ship from Qingdao to Sohar, Salalah (a major transshipment hub) and Muscat (Sultan Qaboos Port). Sea transit is roughly 14–22 days — one of our faster Gulf lanes. A 20-ft container carries about 22–25 tons of 0.35–0.50 mm coils. We quote FOB Tianjin or CIF, with seaworthy export packing built for heat and humidity.
Frequently Asked Questions
Do you supply genuine PVDF for the Omani climate?
Yes — branded Kynar 500 fluorocarbon for superior UV and salt resistance, ideal for Oman’s heat and coastal air.
Can you supply PPGI for sandwich panel lines?
Yes — smooth, uniformly coated coil with strong adhesion and tight tolerance.
Lead time to Sohar or Salalah?
Production 15–20 days + transit 14–22 days ≈ 30–42 days factory-to-port.
Payment terms?
T/T (30% deposit, 70% against B/L copy) and L/C at sight, in USD.